{"id":5651,"date":"2026-03-20T09:05:14","date_gmt":"2026-03-20T08:05:14","guid":{"rendered":"https:\/\/buw-engineering.com\/dienstleistung\/consultancy\/"},"modified":"2026-06-17T11:19:07","modified_gmt":"2026-06-17T09:19:07","slug":"consultancy","status":"publish","type":"dienstleistung","link":"https:\/\/buw-engineering.com\/en\/dienstleistung\/consultancy\/","title":{"rendered":"Consultancy"},"content":{"rendered":"<section class=\"l-section wpb_row height_medium\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_flex valign_top type_default stacking_default\"><div class=\"vc_col-sm-12 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><h2>What we mean by consultancy:<\/h2>\n<p>We objectively review ongoing or critical projects, identify risks at an early stage and provide clear, transparent recommendations for action, so that you can take timely corrective measures, make better decisions and get projects back on a stable footing.<\/p>\n<p>It is not uncommon for us to be called in to projects that have got out of hand, where we have sometimes had to make difficult decisions at short notice. To prevent this from happening, it makes sense to review ongoing projects so that corrective action can be taken at an early stage.<\/p>\n<p>With our \u201cConsulting\u201d service, that is exactly what we do: we carry out an objective review and provide clear, transparent and easy-to-understand recommendations for action.<\/p>\n<\/div><\/div><div class=\"w-separator size_medium\"><\/div><div class=\"w-tabs layout_hor style_default switch_click has_scrolling\" style=\"--sections-title-size:1em\"><div class=\"w-tabs-list items_4 align_none\"><div class=\"w-tabs-list-h\"><button class=\"w-tabs-item active defined-active\" aria-controls=\"content-p05c\" aria-expanded=\"true\"><span class=\"w-tabs-item-title\">The benefits for you<\/span><\/button><button class=\"w-tabs-item\" aria-controls=\"content-t953\" aria-expanded=\"false\"><span class=\"w-tabs-item-title\">Typical subject areas<\/span><\/button><button class=\"w-tabs-item\" aria-controls=\"content-cbc7\" aria-expanded=\"false\"><span class=\"w-tabs-item-title\">Who might find this interesting?<\/span><\/button><button class=\"w-tabs-item\" aria-controls=\"content-p151\" aria-expanded=\"false\"><span class=\"w-tabs-item-title\">Typical workflow of a consultancy project<\/span><\/button><\/div><\/div><div class=\"w-tabs-sections titles-align_none icon_chevron cpos_right\"><div class=\"w-tabs-section active\" id=\"p05c\"><button class=\"w-tabs-section-header active\" aria-controls=\"content-p05c\" aria-expanded=\"true\"><div class=\"w-tabs-section-title\">The benefits for you<\/div><div class=\"w-tabs-section-control\"><\/div><\/button><div  class=\"w-tabs-section-content\" id=\"content-p05c\"><div class=\"w-tabs-section-content-h i-cf\"><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><ul>\n<li><strong>Early risk detection<\/strong> rather than last-minute firefighting<\/li>\n<li><strong>Well-informed decisions<\/strong> through structured analyses and decision-making templates<\/li>\n<li><strong>Faster implementation<\/strong> thanks to prioritised measures and clear lines of responsibility<\/li>\n<li><strong>Better coordination between departments<\/strong> (Development, Quality, Manufacturing, Procurement, Management)<\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div><\/div><div class=\"w-tabs-section\" id=\"t953\"><button class=\"w-tabs-section-header\" aria-controls=\"content-t953\" aria-expanded=\"false\"><div class=\"w-tabs-section-title\">Typical subject areas<\/div><div class=\"w-tabs-section-control\"><\/div><\/button><div  class=\"w-tabs-section-content\" id=\"content-t953\"><div class=\"w-tabs-section-content-h i-cf\"><div class=\"w-iconbox iconpos_left style_default color_primary align_left\"><div class=\"w-iconbox-icon\" style=\"font-size:1.5rem;\"><i class=\"fas fa-wave-square\"><\/i><\/div><div class=\"w-iconbox-meta\"><h6 class=\"w-iconbox-title\">Product Development &amp; Design<\/h6><div class=\"w-iconbox-text\"><p>Structure of development projects, design reviews, evaluation of alternative concepts, advice on the range of tools available<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"w-iconbox iconpos_left style_default color_primary align_left\"><div class=\"w-iconbox-icon\" style=\"font-size:1.5rem;\"><i class=\"fas fa-wave-square\"><\/i><\/div><div class=\"w-iconbox-meta\"><h6 class=\"w-iconbox-title\">Quality &amp; Regulatory Affairs<\/h6><div class=\"w-iconbox-text\"><p>Practical implementation of regulatory requirements, review of risks and scope of audits<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"w-iconbox iconpos_left style_default color_primary align_left\"><div class=\"w-iconbox-icon\" style=\"font-size:1.5rem;\"><i class=\"fas fa-wave-square\"><\/i><\/div><div class=\"w-iconbox-meta\"><h6 class=\"w-iconbox-title\">Organisation &amp; Processes<\/h6><div class=\"w-iconbox-text\"><p>Optimisation of development and approval processes, and the design of roles and interfaces<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"w-iconbox iconpos_left style_default color_primary align_left\"><div class=\"w-iconbox-icon\" style=\"font-size:1.5rem;\"><i class=\"fas fa-wave-square\"><\/i><\/div><div class=\"w-iconbox-meta\"><h6 class=\"w-iconbox-title\">Industrialisation &amp; Manufacturing<\/h6><div class=\"w-iconbox-text\"><p>Seamless transition from prototype to series production, Design for Manufacturing &amp; Assembly, start-up planning<\/p>\n<\/div><\/div><\/div><\/div><\/div><\/div><div class=\"w-tabs-section\" id=\"cbc7\"><button class=\"w-tabs-section-header\" aria-controls=\"content-cbc7\" aria-expanded=\"false\"><div class=\"w-tabs-section-title\">Who might find this interesting?<\/div><div class=\"w-tabs-section-control\"><\/div><\/button><div  class=\"w-tabs-section-content\" id=\"content-cbc7\"><div class=\"w-tabs-section-content-h i-cf\"><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><ul>\n<li>Executive Board &amp; Management (portfolio, investment and project decisions)<\/li>\n<li>Project &amp; Product Managers (meeting deadlines, risk reduction)<\/li>\n<li>Development &amp; Design (clear requirements, structured reviews)<\/li>\n<li>Quality &amp; Regulatory Affairs (compliant, practical solutions)<\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div><\/div><div class=\"w-tabs-section\" id=\"p151\"><button class=\"w-tabs-section-header\" aria-controls=\"content-p151\" aria-expanded=\"false\"><div class=\"w-tabs-section-title\">Typical workflow of a consultancy project<\/div><div class=\"w-tabs-section-control\"><\/div><\/button><div  class=\"w-tabs-section-content\" id=\"content-p151\"><div class=\"w-tabs-section-content-h i-cf\"><div class=\"w-iconbox iconpos_left style_default color_primary align_left icontype_img\"><div class=\"w-iconbox-icon\" style=\"font-size:4rem;\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"131\" height=\"145\" viewBox=\"0 0 131 145\">\n  <text id=\"_1.\" data-name=\"1.\" fill=\"#707070\" font-size=\"100\" font-family=\"Jost-Medium, 'Jost\\*'\" font-weight=\"500\"><tspan x=\"0\" y=\"107\">1.<\/tspan><\/text>\n<\/svg>\n<\/div><div class=\"w-iconbox-meta\"><h6 class=\"w-iconbox-title\">Kick-off &amp; Defining Objectives<\/h6><div class=\"w-iconbox-text\"><p>Project, objectives, framework conditions, desired outcomes.<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_medium\"><\/div><div class=\"w-iconbox iconpos_left style_default color_primary align_left icontype_img\"><div class=\"w-iconbox-icon\" style=\"font-size:4rem;\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"131\" height=\"145\" viewBox=\"0 0 131 145\">\n  <text id=\"_2.\" data-name=\"2.\" fill=\"#707070\" font-size=\"100\" font-family=\"Jost-Medium, 'Jost\\*'\" font-weight=\"500\"><tspan x=\"0\" y=\"107\">2.<\/tspan><\/text>\n<\/svg>\n<\/div><div class=\"w-iconbox-meta\"><h6 class=\"w-iconbox-title\">Analysis &amp; Evaluation<\/h6><div class=\"w-iconbox-text\"><p>Review of documents, discussions with key personnel, identification of risks and opportunities.<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_medium\"><\/div><div class=\"w-iconbox iconpos_left style_default color_primary align_left icontype_img\"><div class=\"w-iconbox-icon\" style=\"font-size:4rem;\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"131\" height=\"145\" viewBox=\"0 0 131 145\">\n  <text id=\"_3.\" data-name=\"3.\" fill=\"#707070\" font-size=\"100\" font-family=\"Jost-Medium, 'Jost\\*'\" font-weight=\"500\"><tspan x=\"0\" y=\"107\">3.<\/tspan><\/text>\n<\/svg>\n<\/div><div class=\"w-iconbox-meta\"><h6 class=\"w-iconbox-title\">Prioritisation &amp; Action Plan<\/h6><div class=\"w-iconbox-text\"><p>Focusing on the key areas for action, developing a realistic roadmap.<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_medium\"><\/div><div class=\"w-iconbox iconpos_left style_default color_primary align_left icontype_img\"><div class=\"w-iconbox-icon\" style=\"font-size:4rem;\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"131\" height=\"145\" viewBox=\"0 0 131 145\">\n  <text id=\"_4.\" data-name=\"4.\" fill=\"#707070\" font-size=\"100\" font-family=\"Jost-Medium, 'Jost\\*'\" font-weight=\"500\"><tspan x=\"0\" y=\"107\">4.<\/tspan><\/text>\n<\/svg>\n<\/div><div class=\"w-iconbox-meta\"><h6 class=\"w-iconbox-title\">Implementation &amp; support (optional)<\/h6><div class=\"w-iconbox-text\"><p>Facilitating workshops and reviews; providing support for project management and specialist departments.<\/p>\n<\/div><\/div><\/div><div class=\"w-separator size_medium\"><\/div><div class=\"wpb_text_column us_custom_1b04de86\"><div class=\"wpb_wrapper\"><p><em>Please note: The process and services described above represent a typical approach. We will work with you to determine the scope, level of detail and specific structure of each step on a project-by-project basis.<\/em><\/p>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div><div class=\"w-separator size_large\"><\/div><\/div><\/div><\/div><\/div><\/div><\/section>\n","protected":false},"author":18,"featured_media":4015,"template":"","meta":{"_acf_changed":false,"footnotes":""},"categories":[74],"class_list":["post-5651","dienstleistung","type-dienstleistung","status-publish","has-post-thumbnail","hentry","category-shop"],"acf":[],"_links":{"self":[{"href":"https:\/\/buw-engineering.com\/en\/wp-json\/wp\/v2\/dienstleistung\/5651","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buw-engineering.com\/en\/wp-json\/wp\/v2\/dienstleistung"}],"about":[{"href":"https:\/\/buw-engineering.com\/en\/wp-json\/wp\/v2\/types\/dienstleistung"}],"author":[{"embeddable":true,"href":"https:\/\/buw-engineering.com\/en\/wp-json\/wp\/v2\/users\/18"}],"version-history":[{"count":1,"href":"https:\/\/buw-engineering.com\/en\/wp-json\/wp\/v2\/dienstleistung\/5651\/revisions"}],"predecessor-version":[{"id":5654,"href":"https:\/\/buw-engineering.com\/en\/wp-json\/wp\/v2\/dienstleistung\/5651\/revisions\/5654"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buw-engineering.com\/en\/wp-json\/wp\/v2\/media\/4015"}],"wp:attachment":[{"href":"https:\/\/buw-engineering.com\/en\/wp-json\/wp\/v2\/media?parent=5651"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buw-engineering.com\/en\/wp-json\/wp\/v2\/categories?post=5651"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}